Power discretes, MOSFETs, IGBTs, diodes, small-signal transistors.
Lead-time range, Dec 2025 – Oct 2026 Reading the chartsThe shaded band is the lead-time range in weeks; the line is its midpoint. A red triangle marks an open-ended “52+” month.
The colored strip shows each month’s status. Gaps are months the category wasn’t reported.
Numbered dots are dated market events. They are listed under the chart on each category page.
The shaded band is the lead-time range in weeks; the line is its midpoint. A red triangle marks an open-ended “52+” month.
The colored strip shows each month’s status. Gaps are months the category wasn’t reported.
Numbered dots are dated market events. They are listed under the chart on each category page.
- 1March 15, 2026 — China State Council Order No. 834: unified countermeasures framework.Permanent legal machinery for supply-chain countermeasures — escalation can now move faster in future disputes.source
Monthly status Status scale1 Stable: normal lead times, predictable supply.
2 Watch: early signals such as rising prices or stretching in some families. Monitor.
3 Alert: lead times stretching or selective allocation. Check exposed parts on your BOM.
4 Critical: broad allocation or severe extension. Plan around constraint.
The status is the analyst’s judgment, informed by the sources. It is not a formula.
Full methodology →
1 Stable: normal lead times, predictable supply.
2 Watch: early signals such as rising prices or stretching in some families. Monitor.
3 Alert: lead times stretching or selective allocation. Check exposed parts on your BOM.
4 Critical: broad allocation or severe extension. Plan around constraint.
The status is the analyst’s judgment, informed by the sources. It is not a formula.
Full methodology →Subcategories, October 2026
| Subcategory | Status | Lead time | Trend | Pricing | Note |
|---|---|---|---|---|---|
| MOSFETs | 4 · Critical | 30–52+ wks | rising | rising | |
| IGBTs | 4 · Critical | 30–52+ wks | rising | rising |
Month by month
- Oct 20264 · CriticalDiscretes remain selectively tight.
- Sep 20264 · CriticalDiscretes remain selectively tight. Some power devices reach 52+ weeks.
- Aug 20264 · CriticalPower discretes carry 30 to 52+ week ranges in the deeper data, and are stretching even where category averages look calmer.
- Jul 20264 · CriticalWatch in January, critical by March, held critical through July.
- Jun 20264 · CriticalMOSFETs and IGBTs tightening; held critical.
- May 20264 · CriticalDiscrete power stretching.
- Apr 20264 · CriticalPower discretes and switching diodes at 52 weeks — refresh assumptions if these sit on a critical BOM path.
- Mar 20264 · CriticalPower discretes extending to 52 weeks; plant export issue driving broad extension across low-voltage, high-voltage, bipolar segments.
- Feb 20262 · WatchWatch for extended lead times on low-voltage MOSFETs.
- Jan 20262 · WatchWatch: extended lead times emerging on low-voltage MOSFETs.
- Dec 20253 · AlertStretching: supplier lead times for MOSFETs and rectifiers extending up to 52 weeks even where pricing appears flat.
Data table
| Month | Status | Lead time | Pulse Index |
|---|---|---|---|
| Oct 2026 | 4 · Critical | 16–52+ wks | — |
| Sep 2026 | 4 · Critical | 16–52+ wks | — |
| Aug 2026 | 4 · Critical | 20–52+ wks | — |
| Jul 2026 | 4 · Critical | 20–52 wks | — |
| Jun 2026 | 4 · Critical | 20–52 wks | — |
| May 2026 | 4 · Critical | 20–52 wks | — |
| Apr 2026 | 4 · Critical | 26–52 wks | — |
| Mar 2026 | 4 · Critical | 26–52 wks | — |
| Feb 2026 | 2 · Watch | — | — |
| Jan 2026 | 2 · Watch | — | — |
| Dec 2025 | 3 · Alert | 20–52 wks | — |
Latest reading synthesized from: Future Electronics Market Conditions Report · TTI Lead Time Trends · Sourceability Lead Time Report — see methodology.