Pulse / Trends / Discretes

Discretes

Power discretes, MOSFETs, IGBTs, diodes, small-signal transistors.

4 · Critical20–52 wksHigh consensus: Sources agree power discretes are extended; small-signal readings vary.
Pulse Index

Lead-time range, Dec 2025 – Jul 2026

03060wksDec 2025: 20–52 wksMar 2026: 26–52 wksApr 2026: 26–52 wksMay 2026: 20–52 wksJun 2026: 20–52 wksJul 2026: 20–52 wks12026-03-15 — China State Council Order No. 834: unified countermeasures frameworkDecFebAprJunJul
  1. 1March 15, 2026 — China State Council Order No. 834: unified countermeasures framework.Permanent legal machinery for supply-chain countermeasures — escalation can now move faster in future disputes.source

Monthly status

Dec 2025: 3 · Alert3DecJan 2026: 2 · Watch2Feb 2026: 2 · Watch2FebMar 2026: 4 · Critical4Apr 2026: 4 · Critical4AprMay 2026: 4 · Critical4Jun 2026: 4 · Critical4JunJul 2026: 4 · Critical4Jul

Why it's moving

Power discretes and switching diodes sit at up to 52 weeks. The Nexperia ownership dispute took a plant shipping tens of billions of units a year partially out of normal channels, forcing broad requalification. Gallium exposure (GaN) and packaging capacity in Malaysia and China add structural tightness beneath the event-driven disruption.

Single-supplier event

A disruption at one dominant supplier (plant outage, trade dispute, ownership fight) that moves a whole category — e.g. the Nexperia dispute disrupting automotive discretes.Sourceability: Export controls on Nexperia fuel semiconductor supply chain risk (2025-10)

China export controls

China's export controls on gallium, germanium, antimony and superhard materials hit GaN/SiC power devices, LEDs and IR optics. The suspension of bans on US-bound exports runs only to Nov 27, 2026.Pillsbury: China suspends export controls on certain critical minerals (2025-11)

Backend capacity (MY/PH)

Assembly, test and packaging concentrate in Taiwan, China, Malaysia (~10–13% of OSAT) and the Philippines; backend congestion shows up as lead-time stretch even when wafers are available.AnySilicon: OSAT locations (2025)

Analyst read as of July 2026. Facts cited via the driver tags above; the interpretation is the analyst's own.

Subcategories, July 2026

SubcategoryStatusLead timeTrendPricingNote
MOSFETs4 · Critical27–52 wksrisingrisingLow-voltage MOSFETs extended across suppliers.
IGBTs3 · Alert27–32 wkssteadyrisingLong but stable; pricing still firming.

Month by month

  • Jul 20264 · CriticalWatch in January, critical by March, held critical through July.
  • Jun 20264 · CriticalMOSFETs and IGBTs tightening; held critical.
  • May 20264 · CriticalDiscrete power stretching.
  • Apr 20264 · CriticalPower discretes and switching diodes at 52 weeks — refresh assumptions if these sit on a critical BOM path.
  • Mar 20264 · CriticalPower discretes extending to 52 weeks; plant export issue driving broad extension across low-voltage, high-voltage, bipolar segments.
  • Feb 20262 · WatchWatch for extended lead times on low-voltage MOSFETs.
  • Jan 20262 · WatchWatch: extended lead times emerging on low-voltage MOSFETs.
  • Dec 20253 · AlertStretching: supplier lead times for MOSFETs and rectifiers extending up to 52 weeks even where pricing appears flat.
Data table
MonthStatusLead timePulse Index
Jul 20264 · Critical20–52 wks
Jun 20264 · Critical20–52 wks
May 20264 · Critical20–52 wks
Apr 20264 · Critical26–52 wks
Mar 20264 · Critical26–52 wks
Feb 20262 · Watch
Jan 20262 · Watch
Dec 20253 · Alert20–52 wks

Latest reading synthesized from: Avnet Abacus Lead-Time Guide · Future Electronics Market Conditions Report · TTI Lead Time Trends — see methodology.