Circuit Protection

Fuses, TVS diodes, varistors, PTC devices, ESD protection.

2 · Watch11–18 wksHigh consensus: Sources agree: stable with early upward signals.
Pulse Index

Lead-time range, Dec 2025 – Jul 2026

01020wksMay 2026: 11–18 wksJun 2026: 11–18 wksJul 2026: 11–18 wksDecFebAprJunJul

Monthly status

Dec 2025: no dataDecJan 2026: 1 · Stable1Feb 2026: 1 · Stable1FebMar 2026: 1 · Stable1Apr 2026: 1 · Stable1AprMay 2026: 1 · Stable1Jun 2026: 2 · Watch2JunJul 2026: 2 · Watch2Jul

Why it's moving

Lead times hold at 11–18 weeks. The move to watch reflects upward pricing indicators tied to metals and ceramics inputs rather than genuine delivery stretch — a category to monitor, not to escalate.

Metals cost

Copper, gold, silver and palladium prices flow directly into connectors, relays, contacts and plating — a pricing driver for interconnect and electromechanical more than a lead-time driver.FRED: Global price of copper (PCOPPUSDM) (2026)

Analyst read as of July 2026. Facts cited via the driver tags above; the interpretation is the analyst's own.

Month by month

  • Jul 20262 · WatchStable through May, tipped to watch in June on upward indicators.
  • Jun 20262 · WatchTipped to watch in June on upward indicators.
  • May 20261 · StableCircuit protection modestly up but stable.
  • Apr 20261 · StableStable.
  • Mar 20261 · StableStable.
  • Feb 20261 · StableStable.
  • Jan 20261 · StableStable.
Data table
MonthStatusLead timePulse Index
Jul 20262 · Watch11–18 wks
Jun 20262 · Watch11–18 wks
May 20261 · Stable11–18 wks
Apr 20261 · Stable
Mar 20261 · Stable
Feb 20261 · Stable
Jan 20261 · Stable

Latest reading synthesized from: Avnet Abacus Lead-Time Guide · TTI Lead Time Trends — see methodology.